Kartaly municipal area
Uncompleted construction building
|
Size of the building development area |
85.3 х 20.50 m. 1791 sq. m. |
|
Short description of the building |
Brick building, reinforced concrete floor, reinforced concrete basement, rolled roofing material |
|
Location of the building |
14 B, Lenin street, Kartaly town, Chelyabinsk region |
|
Communications |
Not available |
|
Road infrastructure |
Available |
|
Building condition |
Uncompleted construction - 42% |
|
Short description of the site where the building is located |
Habitation land, with the area of 4,430.3 sq. meters. |
|
Form of use |
Unguarded, abandoned |
|
Owner of land |
OJSC «Russian Railways» |
|
Contact person |
Head of Kartaly department of South Ural Railway, affiliate of OJSC «Russian Railways» Boris Vladimirovich Schurin tel.: 7 (35133) 22572 |
-
МЗМО участвует в строительстве перинатального центра в Магадане.
МЗМО выполняет монтаж комплексов чистых помещений в новом медицинском учреждении. По проекту комплексы чистых помещений будут расположе...
17.03.202667 -
Отчетность за 2025 год: пошаговый алгоритм для бухгалтера
19 марта компания «Микос» приглашает бухгалтеров на бесплатное онлайн-мероприятие «Отчетность за 2025 год: пошаговый алгоритм для бухга...
17.03.202668 -
Подстанции на салазках от ЧЗЭО обеспечат энергией горные работы на месторождении Забайкалья
Одно из крупнейших полиметаллических месторождений России усилит энергохозяйство передвижными подстанциями южноуральского производства....
11.03.2026314








