Project Initiator Information |
Open Joint Stock Company «Ozyorsk Power Installation Plant» 5/3, ul. Krasnoarmeyskaya., Ozyorsk Chelyabinsk region 456780 Tel/fax: 7(351) 30-7-33-63. www.ozeu.ru |
Director |
Sergey Vassilyevich Svinin |
Lines of business |
Design and production of complex non-standard power equipment (high-voltage and low-voltage gear) on order, using utilities of specialized manufacturers. Listed products vary according to an order and extensive quantity of changeable parameters and specific implementations in each group of production. |
Brief description of the project |
Purchasing equipment for own production of fabricated metals block-cases and metal sheathing. The purpose of the project is to raise competitiveness regarding terms of fabrication and prime cost |
Total project cost |
20.5 million rubles |
Required investment |
9.5 million rubles |
Implementation period |
1 year |
Initial permits and approvals |
On the basis of the license contract Open Society " Institute " Neftegazproekt " Joint-Stock Company " OZEU » possesses the right of use for: - the complete switchover, patent 2189680; - distributive system for sectioning electric main (КРУН-СВЛ), patent 2170485; - system of cathodic corrosion protection of the main pipelines(УКЗВ), patent 2161663; - system of uninterruptable power supply transversal oil pipeline latches (БГПСЗ), patent 2211515. Among the company`s in-house developments -block-boxing system of linear consumers electro supply(БЛП), patent 3 38792; - local backup item of linear consumers electro supply (КРУН-ПМР), patent 45055. All the product is certificated. There is a detailed business-plan |
Development stage |
Initial |
Expected form of cooperation |
Investment credit, leasing, individual share, grant |
Contact person |
Sergey Vasilevich Svinin, director Tel./Fax: 8(351) 30-7-33-63. e-mail: mail@ozeu.ru |
-
Челябинский «Завод Роботов» принял участников программы «Технологический лидер»
Программа, организованная Корпоративной Академией Росатома, включала экскурсию по заводу, в ходе которой гостям показали полный цикл пр...
25.06.2025176 -
Андрей Гартунг дал интервью ежедневной деловой газете «Ведомости» и раскрыл планы по производству новой промышленной продукции.
ООО «Завод Роботов» к концу года планирует произвести 800 роботов, в следующем году – 1600 штук. Цель – производить не менее 10 000 изд...
24.06.2025157 -
Челябинский завод электрооборудования модернизировал подстанцию пермского предприятия
Специалисты Челябинского завода электрооборудования (ЧЗЭО) успешно завершили модернизацию трансформаторной подстанции для ОАО «...
24.06.2025149