South-Urals Chamber of Commerce and Industry

Construction

 

Tubeconcrete elements with preliminary pressed out kernels

 

Information on the project

Title of the project

Tubeconcrete elements with preliminary pressed out kernels

Name of the orgtanisation

State educational establishment “Magnitogorsk State technical university named after G.I. Nossov”

Leader of the organisation

Nikiforov Boris Alexandrovich, D. Phil. (Technology), professor

Contacts on this project

South-Urals Chamber of Commerce and Industry

 

Postal address:454080, Sonya Krivaya Str.,56 office 402, Chelyabinsk Russia

Phone: (351) 263-68-41

Phone/fax (351)264-78-22

E-mail: [email protected]

 

Annotation

By construction of dwelling houses and public buildings the trend is presently become apparent  to use framework variants. Construction practice shows that buildings with framework scheme and non-bearing outer walls made of light materials are distinguished not only by lower cist price but also look more expressive than bearing-wall many-storied buildings as far as architecture is concerned.

The use of tubeconcrete columns of the offered constructions instead of steel ones  makes it possible to decrease steel consumption by not less than 50 per cent as well as to cut cost of such columns by 35-40 per cent

Exchange of heavy loaded reinforced concrete columns for the tubeconcrete ones allows to shorten steel consumption by 10-25 per cent, decrease concrete consumption by 30-50 per cent as well as their cost reduction by 20-25 per cent.

Purpose

Tubeconcrete construction with preliminary pressed out kernels are the most effective as compact with minor and accidental eccentricity of elements such as columns, compressed elements, piles, viaduct and bridge footings. They are estimated at their true worth and widely used mostly as heavy loadedcolumns of skyscrapers and also as footings of multiple-span bridge in many countries of the world and first of all in Japan, USA, China as well as in some European countries.

Field of application

Erection of multiple-storied framework buildings and constructions. The consumer of production is the construction complex of Russia

Volume of effective demand

In 2005-2006 by erection of the individual dwelling house 12 tubeconcrete columns of the developed construction 9 meters high each of 250.000 roubles total cost

Photo

 

Present stage of development

 

Form of cooperation

 

Center of Intellectual property

 

Director of the Center: Yelena A. Kreshnyanskaya

Phone: : (351) 264-78-22, 263-68-41, email:  [email protected]

Phone: (351) 264-78-22, 263-68-41, email:  [email protected]