Ust-Katav urban district.
Depot building of construction industry
Size of the building |
1690.2 sq. meters |
Short description of the building |
Depot building of construction industry has the degree of completeness – 75% |
Location of the building |
10a, Stroiteley street, Ust-Katav city, Chelyabinsk region. |
Communications |
Heating supply, electric power supply. There is a gas line and water pipe line next to the building. |
Road infrastructure |
There is a highway M5 at the distance of approximately 3 km. |
Building condition |
This building construction completion is needed. |
Form of use |
Production facilities allocation |
Owner of land |
Municipal entity «Ust-Katav urban district » |
Contact person |
Head of Economical, material and land relations department – E.I.Alferova, tel.: 7 (35147)25334 |
-
Челябинский завод электрооборудования присоединился к акции «Елка желаний»
Директор ЧЗЭО Алексей Камынин принял участие во Всероссийской акции «Ёлка желаний». Мероприятие прошло 23 декабря в зале Администрации ...
25.12.202476 -
Миасский завод медицинского оборудования (ПО АМС-МЗМО) продолжает участие в федеральном проекте «Санитарный щит России»
В рамках проекта Миасский завод медицинского оборудования выполняет работы по оснащению объектов Роспотребнадзора в городах Воронеж, Ни...
24.12.202477 -
Технологии ИИ в помощь участникам ВЭД (экспорт/импорт)
Инжиниринговая компания «Ресурс» разработала сервис для развития дружеских и деловых отношений между странами.
24.12.2024113