Ust-Katav urban district.
Depot building of construction industry
Size of the building |
1690.2 sq. meters |
Short description of the building |
Depot building of construction industry has the degree of completeness – 75% |
Location of the building |
10a, Stroiteley street, Ust-Katav city, Chelyabinsk region. |
Communications |
Heating supply, electric power supply. There is a gas line and water pipe line next to the building. |
Road infrastructure |
There is a highway M5 at the distance of approximately 3 km. |
Building condition |
This building construction completion is needed. |
Form of use |
Production facilities allocation |
Owner of land |
Municipal entity «Ust-Katav urban district » |
Contact person |
Head of Economical, material and land relations department – E.I.Alferova, tel.: 7 (35147)25334 |
-
Челябинский трубопрокатный завод завоевал награды сразу в двух номинациях Всероссийского конкурса массового рационализаторства
Челябинский трубопрокатный завод (ЧТПЗ, входит в Трубную Металлургическую Компанию (ТМК)), стал дважды победителем Всер...
11.12.202446 -
Челиндбанк приглашает на бесплатный вебинар «Как повысить монетизацию своего продукта и увеличить продажи»
Алексей Шестаков, сертифицированный бизнес-тренер по управлению и развитию бизнеса, маркетингу и продажам, расскажет, как:
11.12.202470 -
Выставка в Шанхае «EP Shanghai 2024»: чем удивляет Китай и что перенимает Челябинск, рассказал директор ЧЗЭО Алексей Камынин
Ежегодно в конце ноября – начале декабря Шанхай становится центром притяжения специалистов и представителей электроэнергетической отрас...
09.12.2024131