Ust-Katav urban district.
Depot building of construction industry
Size of the building |
1690.2 sq. meters |
Short description of the building |
Depot building of construction industry has the degree of completeness – 75% |
Location of the building |
10a, Stroiteley street, Ust-Katav city, Chelyabinsk region. |
Communications |
Heating supply, electric power supply. There is a gas line and water pipe line next to the building. |
Road infrastructure |
There is a highway M5 at the distance of approximately 3 km. |
Building condition |
This building construction completion is needed. |
Form of use |
Production facilities allocation |
Owner of land |
Municipal entity «Ust-Katav urban district » |
Contact person |
Head of Economical, material and land relations department – E.I.Alferova, tel.: 7 (35147)25334 |
-
Челябинский «Завод Роботов» принял участников программы «Технологический лидер»
Программа, организованная Корпоративной Академией Росатома, включала экскурсию по заводу, в ходе которой гостям показали полный цикл пр...
25.06.2025176 -
Андрей Гартунг дал интервью ежедневной деловой газете «Ведомости» и раскрыл планы по производству новой промышленной продукции.
ООО «Завод Роботов» к концу года планирует произвести 800 роботов, в следующем году – 1600 штук. Цель – производить не менее 10 000 изд...
24.06.2025157 -
Челябинский завод электрооборудования модернизировал подстанцию пермского предприятия
Специалисты Челябинского завода электрооборудования (ЧЗЭО) успешно завершили модернизацию трансформаторной подстанции для ОАО «...
24.06.2025149